×

You are using an outdated browser Internet Explorer. It does not support some functions of the site.

Recommend that you install one of the following browsers: Firefox, Opera or Chrome.

Contacts:

+7 961 270-60-01
ivdon3@bk.ru

  • Reasons for delays in the inspection of buildings and structures at the level of the organization of work

    Carrying out work on the inspection of buildings and structures is a set of measures aimed at identifying the actual condition of the object. Since the work on the inspection of buildings includes the work of various specialists, various problems arise related to the incorrect organization of the work. This article is devoted to the identification of the main elements of deadlines, with a reserve for the further development of a tool to reduce the impact on the timing of work.

    Keywords: inspection of buildings, interaction of specialists, organization of work, non-destructive methods for determining the strength of concrete, project management

  • Estimation of the capacity of sections of the road network based on simulation modeling

    Currently, special attention is paid to ensuring a high level of convenience and road safety. It is impossible to achieve this result without a clear understanding of the expediency of using certain theoretical provisions in practice. The solution to this problem lies in the timely development of simulation algorithms that allow us to accurately assess the effectiveness of applied engineering solutions in the project documentation.

    Keywords: Parking, vehicle, capacity, road network, speed, traffic safety

  • Organization of inspection of objects of unfinished construction

    When performing work on the inspection of residential buildings for deconservation, there are often problems associated with determining the composition of work, as well as problems related to the organization of work. This article discusses the scope of work on the survey of residential buildings for deconservation, as well as presents work in the form of schedules that allow you to predict the timing of work, as well as coordinate the exit of specialists to the facility.

    Keywords: inspection of buildings, conservation of the object, organization of work, schedule of work, construction in progress, scope of work

  • The main problems of the survey of cultural heritage sites

    Since the volume of restoration works of cultural heritage objects has been increasing recently, cases of problems related to the survey of these objects are not uncommon.this article discusses the main problems that arise during the survey of buildings and structures related to cultural heritage objects and suggests possible ways to solve them.

    Keywords: inspection of buildings, object of cultural heritage, organization of work, non-destructive methods for determining the strength of concrete

  • Identification of the significance of the parameters necessary for the selection of the optimal set of machines for the production of earthworks in urban development

    To determine the optimal set of machines for the production of earthworks in urban conditions, it is necessary to make a multi-criteria selection of the set among possible combinations of machines, with each parameter having a certain level of influence. To determine the weight of the parameters, it was decided to conduct an expert survey. The minimum number of experts was determined, a survey was conducted, after which the data was processed, the level of consistency of the expert opinion was obtained, and the level of influence of each parameter on the choice of sets of machines was revealed.

    Keywords: parameters that affect the choice of machine sets, expert survey, Kendall concordance coefficient, earthworks, Pearson coefficient

  • History of development and features of the device and application of green roofs at the present stage

    The article describes the main stages of development of the construction of green roofs in Russia and abroad, the basic scheme and the technology of green roofs.

    Keywords: Green construction, green roofing, environmental certification, noise pollution, drainag

  • History of development and the current state of the rationing system in Russia

    The article describes the main stages of development of the rationing system, as well as foreign analogues. The development of the rationing system and their development potential are described.

    Keywords: rationing system, production efficiency, competitiveness, modern standards