In this paper the technology of repair of ground water retaining structures soil mixture improved quality with and without soil mixture install.Use soil mixture , improved sharps and ensure the return of ashes (repaired ) slopes and ridge structures of high strength (up to 13-15 MPa) and water resistance , thus increasing the effectiveness and quality of the repair work and increased resistance to the elements of the structures induced defect . The presence of the bran soil mixture not only enhances the strength of 30-40% , but also gives a significant increase in water and frost (20-30 %), which prevent or substantially reduce the infiltration of water through the filtration body water retaining structures , since high strength and frost soil-concrete being laid on a slope ( in the recovery slope failure ) and groove (at soil dumping and capacity to or in excess of the design marks ) will reliably protect the body of the dams ( dams ) of the drawdown , erosion , buckling , suffusion , and other deformities.
Keywords: technology, dribble feed , soil mixture, sift, cement, fly ash, dam, construction and repair operations, soil mixture installation, factors plan of the experiment, the regression equation