Development of methods and organizational and technological solutions for the construction of ventilation pipes of nuclear power plant complexes in order to minimize construction time
Abstract
Development of methods and organizational and technological solutions for the construction of ventilation pipes of nuclear power plant complexes in order to minimize construction time
Incoming article date: 01.03.2023The purpose of the study was to find methods to reduce the construction time of special purpose structures. The analysis of the factors influencing the terms of construction of nuclear power plants is carried out. Using the example of calculating the parameters of the ventilation pipe installation of a really erected nuclear power plant, the advantages of replacing the traditionally used for the construction of these structures with the method of "falling arrows" are noted.
Keywords: falling boom, set of machines, installation of structures, scope of work, traction mechanisms, continuity of work, cost, construction period, commissioning period, work cycle